Sponsored By
From the MCO Blog
Machine Control Online
Thursday, May. 24, 2012
RFP - MCNARY SPILLWAY GATE REHABILITATION 3
- Written by Department of the Army
- Created on Thursday, 23 July 2009 14:28
RECOVERY--Z--MCNARY SPILLWAY GATE REHABILITATION 3
This opportunity is a Recovery and Reinvestment Act action
Solicitation Number: W912EF-09-B-0019
Agency: Department of the Army
Office: U.S. Army Corps of Engineers
Location: U.S. Army Engineer District, Walla Walla
RECOVERY--The work is for rehabilitation of four spillway gates and guide slots located in bays indicated by the Contracting Officer. Rehabilitation includes furnishing new parts, clean and remove debris on each gate, replace seals on each gate, remove wheel assemblies, disassemble wheel assemblies, clean wheel assembly parts, inspect wheel assembly parts, reassemble wheel assemblies, reinstall wheel assemblies on each gate, install wear shoes, hanger bolt assemblies and access covers on each gate, rehabilitate latching mechanism, load testing, providing access for performing guide slot repair, providing a Certified Weld Inspector to assist Government personnel during Hydraulic Steel Structures (HSS) inspections, inspect and repair guide and tread plates, welding, line boring, rebuilding wheel bores, furnish new bearings, and painting.
Solicitation Number: W912EF-09-B-0019
[ Back ]
Did you enjoy this article/ news item and want to stay informed? Click here to subscribe to the MachineControl E-Newsletter
MC TOP NEWS
GOT NEWS? Send To
press [at]machinecontrolonline.com
press [at]machinecontrolonline.com
Sponsor
RSS feeds
MachineControl Feeds



















